Mk3s Running this Saturday at GCRN

This coming Saturday 29th June, 125 Group’s Mk3 coaches including INTERCITY livery freshly repainted TSO 12134 will be running passenger trains at Great Central Railway (Nottingham) which is also holding its annual Model Railway Show.

Services depart from Ruddington GCRN station, Yellow Timetable B operates on these dates:
1045 and 1445 departures from Ruddington to Loughborough High Level, 90 minute return trip.
1245 and 1345 departures from Ruddington to Rushcliffe Halt, 50 minute return trip.
Traction will be Brush Type 2 Class 31 locomotive D5830 (31463) running top and tail with a locomotive from the GCRN home fleet. 125 Group’s sleek, air-conditioned Mk3 coaches provide comfortable seating, perfect for railway enthusiasts and all the family, whatever the weather.

After departing from Ruddington, all trains reverse at Fifty Steps (no station) then run southbound along the former Great Central Mainline through the scenic Nottinghamshire countryside calling at Rushcliffe Halt station. The complete route, which is almost 10 miles long, continues through Barnstone Tunnel to Loughborough High Level, which has no station but affords a great view over the Midland Mainline and looks down into Brush Works, with locomotives for overhaul often visible.

Our traditional ‘Buffet 125’ will be open on-board the train, serving a selection of delicious breakfast baps and other hot foods, cold snacks, hot and cold beverages plus alcoholic drinks including bottled ciders, beers and wine, our volunteers will be pleased to serve you. The 125 Group sales stand will also be on the train, with latest merchandise available, including copies of our fantastic new book ‘Inter-City 125 Haynes Workshop Manual’.

Ruddington station (sat-nav postcode NG11 6JS) is the operating base for GCRN with car parking and bus links to Nottingham and Loughborough. This year’s Model Railway Show features the largest ever selection of visiting layouts plus a large range of trade stands. More details from GCRN available HERE.

As always, plans are made and this information is provided in good faith, however all arrangements in railway preservation are subject to alteration in the event of changing circumstances, for which 125 Group can not be held liable.