Mk3 Coaches for GCR(N) Sulzer Sunday

Join us this Sunday 22nd October at Great Central Railway (Nottingham) when 125 Group’s Mk3 coaches will be on passenger trains hauled by Scotrail 47765 and Large-Logo 47292 running top and tail for ‘Sulzer Running Day’. Services will be operating to the Yellow Timetable with departures from Ruddington at 1030, 1215, 1400 and 1545. Mk3 vehicles 12092, 10206 and 11074 will be in passenger use, Buffet 125 will be available on-board serving drinks and snacks plus 125 Group Sales Stand will be open on the train. Locomotives subject to availability on the day, for more details see GCR(N) website HERE.

Prototype HST power car 41001 is away at Old Oak Common. 125 Group owns six Mk3 coaches: 12092, 10206 and 11074 which are shown in the photograph at Bristol Temple Meads on 1st May 2016, plus recently acquired 12065, 12087 and 12134 which are under restoration at GCR(N) Ruddington. Photo ©125 Group.

Mk3 Coach Restoration Progress

125 Group Mk3 TSO 12087 on test at Rushcliffe Halt GCRN with 56097 and 5376, 15/10/2017. ©K.Baldwin
Working lights inside Mk3 TSO 12087 ©B.Webber

125 Group is delighted to announce major restoration progress with the first of our recently purchased Mk3 coaches at Great Central Railway (Nottingham).

Tourist Standard Open (TSO) 12087 has been the focus of initial efforts. Following completion of roof repairs to make the vehicle watertight, a replacement brake distributor was installed plus some rectification work to PASSCOM pipework, allowing brakes and air systems to be tested and commissioned. Electrical work was then tackled, the coach has been treated to a new set of batteries, individual circuits were livened up and checked, including the lights. 12087 was then placed (locked out of use) at the end of the GCR(N) service train consist on Sunday 15th October and completed 60 miles of fault free running. During the last trip, our engineers allowed the Motor Alternator and Air-Conditioning System to operate on the move from Ruddington to Rushcliffe Halt, which all functioned normally, the batteries charging healthily at 109.3 volts.

Prior to acquisition by 125 Group, the vehicles had been stored out of use for many years. This major progress in less than two months has been possible through the dedication and determined efforts of our volunteers. Further work required to 12087 includes a new buckeye coupler and external door, toilet restoration plus some attention to flooring and carpets. We plan for the coach to re-enter public service on Saturday 4th November and look forward to welcoming passengers on-board!